Marriott Courtyard, Rocky Hill, CT
Proposed site for Marriott Courtyard required removal of large quantity of unsuitable soils to provide a stable foundation platform.
AET provided Geotechnical Investigation to evaluate the sub-surface soil conditions and recommendations for utilizing the unsuitable material using an on-site crusher and mixing the material with imported material resulting in substantial project cost savings.
AET also monitored the entire process to ensure that the material conformed with the project requirements.
|
|